Waypoint™ Design Package v1.0
Waypoint™ — From intent to delivered outcome.
This package is the authoritative product and architecture design baseline for Waypoint™, a governed autonomous project-delivery platform.
Waypoint™ transforms human intent into a designed, planned, executed, delivered, and accepted outcome while preserving human authority over consequential decisions.
1. Core lifecycle
Design → Plan → Execute → Deliver
A cross-cutting Control Plane provides governance, orchestration, lifecycle state, worker/capability management, reporting, integrations, audit, evidence, policy, recovery, and human decision handling.
2. How to use this package
Read the documents in numeric order for the complete design narrative.
For implementation planning:
- treat explicit owner decisions and this approved package as authoritative;
- use
15-Requirements-and-Traceability-Matrix.mdfor stable requirement IDs; - use the detailed specification containing a requirement for its full interpretation;
- use
16-Architecture-Decisions-Assumptions-and-Open-Questions.mdto distinguish settled decisions from implementation choices; - follow
17-Implementation-Planning-Handoff-Specification.mdwhen generating the implementation roadmap and Jira hierarchy; - preserve traceability from requirement → implementation work → validation/evidence → delivery → acceptance.
Do not generate an implementation plan from the README alone.
3. Document index
| # | Document | Primary purpose |
|---|---|---|
| 01 | Product Vision and Principles | Product purpose, principles, scope, project neutrality, reporting |
| 02 | Lifecycle and Operating Model | Design/Plan/Execute/Deliver contracts, gates, control plane |
| 03 | Design Engine Specification | Intent discovery, requirements, design artifacts, readiness |
| 04 | Planning Engine Specification | Decomposition, estimates, dependencies, streams, timeboxes, capabilities |
| 05 | Execute Engine Specification | Readiness, allocation, dispatch, parallel execution, validation, recovery |
| 06 | Delivery Engine Specification | Delivery units, deployment/cutover, validation, rollback, acceptance |
| 07 | Worker, Agent and Capability Model | Humans, AI agents, teams, tools, skills, capacity, permissions |
| 08 | Governance, Gates and Human Control | Approvals, policy, risk, exceptions, stop controls, evidence |
| 09 | Canonical Domain Model | Provider-neutral entities, identities, events, traceability |
| 10 | System Architecture and Integration | Logical architecture, APIs, persistence, orchestration, adapters |
| 11 | Reporting, Analytics and API | Dashboards, metrics, projections, reporting/query APIs |
| 12 | Non-Functional Requirements | Reliability, security, recoverability, observability, quality |
| 13 | MVP Scope and Release Boundaries | Vertically complete initial product boundary |
| 14 | Adaptive Execution and Continuous Replanning | Learning during execution, new work, Jira maintenance, gates |
| 15 | Requirements and Traceability Matrix | Stable implementation requirement IDs |
| 16 | Architecture Decisions, Assumptions and Open Questions | Settled direction versus implementation choices |
| 17 | Implementation Planning Handoff | Rules for turning this package into an executable implementation plan |
4. Authoritative product decisions
- Waypoint™ is project-type neutral.
- Jira is an operational work ledger/projection, not Waypoint™'s canonical domain.
- Reporting and analytics are first-class Control Plane capabilities.
- Waypoint™ exposes governed reporting/query APIs independent of Jira reporting.
- Workers are capability-based and may be humans, AI agents, agent teams, automations, or external systems.
- Completion is evidence-based.
- Autonomous work must be observable, interruptible, auditable, and recoverable.
- Approvals bind to exact artifact/action versions.
- External providers are integrated through adapters.
- Long-running lifecycle/execution state is durable and cannot depend on conversation or process memory.
- Waypoint™ maintains the plan while it executes it.
- The approved baseline is preserved while the current execution plan evolves through governed discoveries.
- Low-risk in-scope discovered work may be created, estimated, scheduled, synchronized to Jira, and executed automatically.
- Material changes raise the appropriate Design, Plan, Governance, or Delivery gate.
5. Reporting
Reporting spans the complete lifecycle and includes current state, history, estimates versus actuals, streams/timeboxes, worker capacity/utilization, quality, failures, delivery, gates, audit, evidence, and adaptive-plan changes.
A first-party Reporting Module and authorized external reporting clients should consume governed Waypoint™ reporting APIs based on canonical Waypoint™ concepts.
6. Jira behavior
When Jira is configured, Waypoint™ continuously maintains the operational work representation.
Waypoint™ may create and update Tasks/Bugs, hierarchy, estimates, dependencies, sprints/timeboxes, streams, assignments/labels, statuses, comments, and external links according to policy.
All executable implementation work should be represented by a Task or Bug.
7. Software-development policy profile
For Waypoint™'s own implementation unless explicitly changed:
feature → preview → main
Expected practices include:
- commits and detailed pull requests;
- work-item traceability;
- PR template and automated compliance validation;
- required CI/testing;
- MkDocs Material documentation;
- strict documentation builds;
- documentation maintained with implementation;
- git worktrees for parallel agent work where appropriate;
- worker responsibility for clean/pruned temporary workspaces;
- review of Jira comments for owner feedback.
These are configurable software-project policies, not universal Waypoint™ domain assumptions.
8. Implementation-planning entry point
The next lifecycle activity is implementation planning.
The planning process should produce:
- phases/releases;
- epics and executable Tasks/Bugs;
- dependencies;
- parallel streams;
- estimates;
- sprint/timebox recommendations;
- capability requirements;
- worker/team forecast;
- architecture spikes;
- testing and documentation work;
- reporting work;
- governance work;
- adaptive-execution work;
- requirement coverage;
- Jira materialization manifest.
Implementation must not begin autonomously until the generated plan passes its Plan Gate.
9. Package integrity
This v1.0 package intentionally contains one master README and 17 numbered specifications. Temporary batch READMEs are excluded.
The package is intended to be used as a coherent specification set rather than as independent drafts.